PA-43 - Pennsylvania Turnpike, Jefferson Hills PA (June 2024 - Present)

This project is probably one of our biggest turnpike jobs yet. With regular concrete placements varying from 50 to 2000 yards, it’s been very busy to say the least. The work is for a long stretch of roadway that will likely not end anytime soon. So as long as the contractor will have us, we’ll plan on seeing this through to the end, wherever that winds up being.

 

Pittsburgh Line Retaining Walls, Wilkinsburg PA (April 2024 - Present)

We have been testing shotcrete on this project almost every week now. The contractor currently has our crews testing material onsite, along with coring their panels and checking compressive strength. As you can see from the image, we still have a considerable distance to go.

 
 
 

Hampton Township Water Pollution Control Facility, Allison Park PA (2022 - Present)

Since December of 2022, our team has been hard at work testing concrete on this project. With many of the concrete placements exceeding 200 yards in material, it’s certainly been one of our larger water treatment jobs so far.

Wilkins Avenue County Roads Project, Braddock Hills PA (2023 - 2024)

The concrete testing on Wilkins Avenue was pretty consistent, despite being a smaller project. Specific work included a moment slab, a wall, and inlets, with asphalt work following after. This project came and went quicker than we first imagined, but we’re glad we were still given a part to play in it.